Wednesday, September 15, 2021

A typical real estate project development process

Author: Sachin Gupta | Find me on Twitter

Once the land development process has been completed successfully, a developer will focus his/her energies on the project development process. Developing and delivering a real estate project successfully is challenging and it lasts for several years passing through various phases. Primarily any real estate project can be divided into 5 phases:


Phase I – Land acquisition
The details about land acquisition process can be found in our earlier post of land development process.


Phase II – Construction
Construction phase requires applying for license (permitting), and project development.

  • Permitting/Licensing:

The permitting process usually begins with an application which identifies the site, its location, and a preliminary design of the improvements to be constructed. This application is then used by public officials to verify compliance with its current zoning classification. If it complies, the permit is granted and the construction of the project may commence subject to building codes and inspections. If the permit is denied, the applicant will usually clarify or amend the application and will ask the city planning staff/director to review it again.

  • Preliminary checklist – Project development:

This checklist is usually the first step that a developer reviews when evaluating a site for possible development.

    1. Allowable uses per zoning classification.
    2. Minimum lot size per zoning classification.
    3. Maximum floor to area ratio (FAR).
    4. Building bulk/density limits.
    5. Setback/building line.
    6. Building height limits.
    7. Building footprint/envelope.
    8. Parking ratios.

  • Important terms/project development:
    1. Setback/building line – requirement to construct building a specified number of feet (setback) from the right-of-way line or other landmark.
    2. Right-of-way line – area designated for a public street or alley that is dedicated for traffic, public use, utilities, etc.
    3. Building related terms:
          • Footprint – it is the shape or outline of the primary building slab or foundation as it will be constructed on the site.
            • Envelope – the total outside perimeter of a structure, including footprints and any exterior patios, mall ways, landscaping, etc.
              • Facade – the exterior, usually the main entrance of a structure
                • Bulk – a three dimensional space within which height, width, footprint, and number of structures/elevations/shapes are viewed in total relative to the land area upon which it will sit to determine land use intensity.
                  • Building codes – refer to required materials and methods used to construct improvements within a jurisdiction.
                    • Permit- document executed by the director of planning authorizing the construction, restoration, alteration, repair, etc., of a structure and acknowledging that it conforms to requirements under the applicable zoning ordinance.
                1. Floor to area ratio (FAR) – it is usually calculated as gross building area divided by square footage of land area.
                2. Height restrictions – used to limit the vertical height of a structure to be constructed.
                3. Allowable use – user activities permitted in a zoning classification
                4. Impact fees – charged by public entities to cover added public sector expenses expected to be caused by the development such as traffic control, drainage, etc.
                5. Incentive zoning – used by city planners to accomplish community goals simultaneously with private sector development.
                6. Inclusion zoning – part of a zoning ordinance that requires that a specified type of development be included in order to obtain permit for that site.
                7. Minimum lot size – per zoning classification
                8. Parking ratio – required number of parking spaces per sq. ft of gross building space or per number of apartment units.
                9. Site plans – drawing done to scale depicting the placement relative to other requirements
                10. Traffic counts – number of vehicle trips per hour past a specific site.
                11. Encroachment – occurs when the construction of improvements extends over a property line on to an adjacent property.
                12. Property tax abatement – forgiveness of taxes for a specified number of years.
                13. Land to value ratio – calculated as rupee value of land to total project value (including land) anticipated upon completion of project.


              Phase III – Completion and occupancy

              There are certain risks in any real estate project development. Once the construction has been completed, there is an additional risk of selling and handing over the project to clients or bringing in tenants in case of rental property. Risk begins with land acquisition and increase steadily as construction commences until cash flows from the leasing phase materialize. It should be noted that factors determining the demand for type of space (such as office, retail, warehouse) being developed are critical to project risk. These factors may manifest themselves in current market indicators, such as vacancy rate levels, rent levels, or the extent of leasing commitments from the tenants.

              A very good understanding of the underlying economic base of an urban area or region is critical when assessing the viability of real estate development.  The point is that investors must examine the demand for space in terms of the characteristics of the demand by end users (tenants) in a given market. This demand in turn depends on the type of employment in the local market and the nature of the functions tenants will perform. Only by understanding the local economy and the nature of employment can developer anticipate demand accurately and produce and supply the quantity and quality of space in the proper combination to satisfy market demand.


              Phase IV – Management

              Once the property is occupied by clients/tenants, there is need for professionally managed facility management team. This team can look into the property management tasks such as maintenance, HVAC, parking management, security, civil works, housekeeping, landscaping, etc. These tasks are equally important and ascertain the long life of property and thus ensure positive rental income as well as capital appreciation. 


              Phase V – Sale
              The developer may choose to sell the property from construction phase onward as happens in residential development in India. Or he/she may choose to hold the property in case of commercial developments provided rental income from the commercial properties is significant enough to justify retention.




              Have any Questions?

              Saturday, May 15, 2021

              Looking to construct your own house on a given piece of land? Pay attention to stages of construction and the cost part of it.

              Author: Sachin Gupta | Find me on Twitter

              Planning to build your home on a piece of plot? What are the things that one needs to keep in mind before embarking on a year long journey of construction and dealing with multiple contractors, suppliers, etc? Surely, as an owner of the plot, you would have got multiple offers from architectural firms, contractors about the cost estimate. However, before even talking to these firms, one need to do his/her cost estimation.

              Constructing one’s house is not easy because of the nature of the work. One needs to work/deal with professional firms such as architects, contractors and at the same time deal with labor. Therefore, you not only need to plan the stages of construction but also the costing part of it. Doing the cost analysis helps you in analyzing what you need to build and what you can postpone for future dates. For example, if your budget is limited, then in all likelihood, you may not go for modular kitchens, lavish bath fittings, etc.

              Here we present the quick ‘to do’ list for you to arrive at a guesstimate of cost that you may incur during the construction of your dream house. This will help you in planning your construction stages as well as cost part of it.



              Have any Questions?

              Saturday, April 24, 2021

              What are the Key Stages in Construction of a House?

              Author: Sachin Gupta | Find me on Twitter

              There are 2 ways in which one can own a house. One, by buying it from the real estate developer in a group housing project, and the second option is by buying a plot of land and constructing it in your own way by adhering to building guidelines.

              There are pros and cons of both the options.

              When you buy the house directly from builder, you do not have to worry about land acquisition, approvals, construction, architects, contractors, etc. However, builder of the housing project may take upward of 4-5 years to hand over the housing unit to you. There is all the likelihood that you may not like the final product and therefore you might end up spending decent amount of money on renovation of your house. There could be other issues such as not finding the apartment on your desired floor, or an apartment with good view and access to sunlight, etc. As far as payment is concerned, you will be making it as per the construction linked plan and that is a big positive.

              On the other hand, if you decide to build your own house, then, you take charge of all the things such as buying the plot, obtaining necessary approvals, dealing with architects & contractors, construction, and finishing. The whole process of building your own house may take about 1 year or more depending on the size of the house you wish to build. However, there will not be any compromise on quality. One important point you should take into consideration is that building your own house will be costly than buying it from the developer. Moreover, you should be prepared to shell out significant portion of the value of the property in 2-3 months time period. Also, you may not get benefits of group housing project such as gym, club, pool, playground, etc.



              Having assessed the pros and cons of both the options and then deciding to develop your own house, you should stick to following construction stages in the development of your house.






              Have any Questions?

              Monday, April 9, 2018

              What is a completion certificate and how to apply for it?

              Author: Sachin Gupta | Find me on Twitter

              In our last post, we discussed various approvals that are needed to construct a house. We also discussed that no matter if you are constructing your own house or buying it from the real estate developer; you still need to get approvals from relevant authorities within your city.

              An important approval (or document) among all the approvals is completion certificate (CC). As the name suggests, this certificate is granted after the completion of the construction of your house or a group housing society. The certificate is issued when the property is ready to be moved in. A completion certificate is issued by the local development authority/Municipal Corporation certifying that:

              1. All necessary works have been completed according to the design plan and other directions, and
              2. The property is fit for moving in.
              3. The construction is carried out as per the building codes set up by the development authority.
              4. The building adheres to the earthquake guidelines, fire fighting guidelines, and do not breach any safety parameters.
              5. The interior work also has been completed as per the approved layout map. 
              6. The development authority has no role in the choice of interior fixtures such as bath fittings, electrical fittings. Fans, cooling systems, ventilation systems such as an exhaust fan, airconditioning, appliances, furniture, electronic items, kitchen fittings, are decided by the homeowner and the development authority has no role in that.


              Therefore, it is your duty to apply for a completion certificate when the house you are constructing is ready to be moved in. Or you should ask your developer to get the completion certificate in case you are buying the property in a group housing society such as a high rise or low rise apartment complex.

              Find below the procedure for obtaining the completion certificate:




              Have any Questions?

              Saturday, March 10, 2018

              What are the main approvals you need from the concerned authorities in urban areas while constructing a house in India?

              Author: Sachin Gupta | Find me on Twitter

              Building one’s own house is what most people dream of. You are always filled with the excitement of designing your bedroom, drawing room, choosing the right set of tiles for the floor, bath fittings, modular kitchen design, etc.  However, in all this frenzy, one might lose track of important approvals that are required from the city planning bodies.

              Whether you are looking to construct your own house in Gurgaon, Delhi, Noida, or other cities in India, the approvals you need from urban bodies remain more or less the same. For example, if you are constructing your house in Noida, then, you must focus on these necessary approvals and accordingly design the house including Bedroom Layout, Modular Kitchen in Noida, Bathroom Layout, Open Areas, Fire Fighting Safeguards, Rain Water Harvesting Rules, etc.

              To ensure that your dream home takes a concrete shape in a smooth manner, you need to obtain certain approvals from the concerned authorities such as Municipal Corporation, Area Development Authority, Electricity Board, Water Supply and Sewerage Board, etc. You must submit relevant documents/certificates along with the design plan to the concerned authorities.

              In case, you are not constructing your own house and rather you are buying it from the real estate developer in a group housing society, then again, you need to verify that your developer has approvals from the concerned authorities such as Municipal Corporation, Area Development Authority, Electricity Board, Water Supply and Sewerage Board, etc.



              Here is a quick reference for the main approvals you need from the concerned authorities in urban areas while constructing a house:






              Have any Questions?